Quality and traceability

Review source channels, traceability documents, date-code limits and receiving criteria for each critical component before issuing your purchase order.

Choose the purchasing channel

Manufacturer or authorised distributor
Name the permitted source on your approved vendor list. If authorisation is a purchase condition, verify it for the manufacturer, product line and region.
Independent supply for a shortage
Identify the offered lot separately. Request available source history, label photographs and the proposed inspection scope. Get written approval for any gap in the evidence before ordering.

Match the evidence to the risk

Buyer requirementAsk for at quotationCheck at receipt
Lot consistencyLot and date-code split by quantity; permission for mixed lots.Reconcile labels and quantities against the accepted split.
Moisture-sensitive partsPackaging condition, moisture sensitivity level and available handling history.Inspect bag seal, indicator and label against your receiving procedure.
TraceabilityWhich source documents can accompany the specific lot; who issued each document.Match document identifiers and part suffixes to the shipment.
Alternate approvalOriginal and offered ordering codes, datasheets and known differences.Match the shipped code to the engineering-approved revision.

Example purchase note

Quote the exact manufacturer part number. Identify any independent-source offer separately. State available lot documentation and packaging condition. Obtain written approval before splitting lots or offering a substitute.